BACK TO MENU

Weather Report

Current Weather

Light rain
Sunday May 1st, 2016 | Updated 7:36 am
54°F12°C

Living the dream.

If you ski/ride on the first day in May (and the last day of the season) for bragging rights and not necessarily the weather, then today is your day. It is May 1, the lifts will close for the season at 4:00pm, and there is a 90% that it will rain at some point today. Come on out and live the dream. 

Conditions are expected to be mushy and for upper-intermediate and experts. The Jet triple is scheduled to begin spinning at 8:30am and we should have at least the Haynes and Jet trails open; maybe Montrealer/Wiggle to boot. 

Lift tickets are $20 for all ages and if you have a Jay-only midweek season pass or any Burke-only season pass, you can stop in at Customer Service to pick up a free lift ticket.  

And if you want to sort out your 2016+17 season pass while you're on property, you can stop in at Customer Service for that too. In fact, you can get the best season pass rates anytime before July 11th (we just extended the re-season rates deadline). Click HERE to learn more.

1 Day Forecast

Light rain
Monday
52°F11°C

Hope you pay us a visit this summer.

Trail Map Lift Status Historical Snowfall

Snow Report

Snow 24 Hrs
0-0 in 0-0 cm
Snow 48 Hrs
0 in 0 cm
Snow 7 Days:
0 in 0 cm
Base Depth
5-25 in 13-64 cm
Season Total
208 in 528 cm
Surface
Spring-like/ Variable
Lifts Open
1 of 9
Trails Open
2 of 78

Photo of the Day

http://jaypeakresort.com/images/uploads/background/Summer_Summit_Panoramic.jpg

Expansion & Development

The debut last December of the new Stateside Hotel and base lodge capped off a $44 million building season that also saw 84 mountain cottages open, as well as a complete revamping of the resort’s entrance. What’s in store for the rest of 2014? A much needed nap. Well, that might be a bit of wishful thinking.
 
In case you missed it, we got into the music business two years ago when we opened the doors to the Foeger Ballroom and began hosting acts like Bruce Horsby, the Wailers and Rusted Root. This summer we’re taking the show outside with the debut of the new Stateside Amphitheater. The 1500-person outdoor music venue will be located between the Stateside Hotel and the Mountain Kids Adventure Center. The setting will offer concert goers both seated and lawn options, plus all of the food and frothy beverages you expect to find while watching music in the mountains. The Stateside Amphitheater opens July 25th with the Jeezum Crow Festival, a two-day concert featuring nine acts including Lukas Nelson, Bronze Radio Return and headliners Dark Star Orchestra.

View/Hide Photos

...And just down the road, progress continues at the various projects comprising the $500 million Northeast Kingdom Economic Development Inititiative:

 

  • Q Burke Mountain Resort will break ground this June on the first phase of its $108 million revitalization with a new hotel and conference center.
  • Jay Peak owners Ariel Quiros and Bill Stenger closed on the Spates Block in downtown Newport this spring and construction of the new Renaissance Block will begin this fall. The project involves razing an entire city block and building a new facility that will offer two floors of commercial space such as a brew pub, and four floors of residences.
  • In December, the two partners announced expanded plans for the Newport Airport. Originally Quiros and Stenger and intended to construct new hangars for the assemby of new aircraft, but at a December 20 press conference, Quiros announced that a new commercial enterprise, Flight Design Americas, LLC, had been established and will be based at the Newport Airport. Flight Design Americas has secured the exclusive production, assembly and distribution rights for North, South and Central America for the Flight Design C4 aircraft, a state-of-the-art four-seat plane.  Flight Design Americas has also secured the exclusive distribution rights for the U.S. and Canada for other products manufactured by Flight Design GmbH., a Stuttgart Germany based company.
  • Along the shores of Lake Memphremagog, crews are readying to begin work on the new AnC Bio campus. Construction of the $110 million state-of-the-art biotechnology facility will begin this summer. 
  • Looking toward 2017/18, a deposit has been made on the land where the new Marina Hotel and Conference Center will be built on the eastern shore of Lake Memphremagog. The new resort is expected to begin welcoming guests summer of 2018.